Location: Beni Suif, Egypt Main Contractor: PERTECH (Jordan) Consultant: ASEC Scope of work: Complete Design electrical and instrumentation erection and commissioning. The project is divided into 2 phases, phase 1 for cement production with 2 ball mills and 4 packing machines. Phase 2 for clinker production.